It’s tempting to start building as soon as you own a plot. But building without the right approvals can lead to fines, stop orders, difficulty getting utilities or loans, and, in serious cases, demolition. Here are the main approvals typically needed for building approval in Kenya.
1. Proof of ownership
The county will want to see that you own the land, usually a title in your name or the owner’s written consent. Make sure your land transfer is complete before applying.
2. Architectural drawings
Prepared by a registered architect, showing:
- floor plans
- elevations (how the building looks from each side)
- sections
- site plan showing the building’s position on the plot, boundaries and access
3. Structural drawings
Prepared by a registered structural engineer, showing foundations, beams, columns and slabs. They’re especially important for storey buildings and are required by most counties for anything beyond very simple structures.
4. County building permit
Submit your drawings to the county government’s planning department. Many counties now accept applications online through e-development or county portals. The county checks your plans against:
- zoning: is the use allowed?
- plot coverage and plot ratio: how much you can build
- building lines: how far from the boundaries
- height limits
- parking, sanitation and drainage
Fees depend on the county and the size of the building.
5. NCA registration
Construction projects should be registered with the National Construction Authority, and contractors should be NCA registered. Check current requirements for your project size.
6. NEMA approval
Larger projects, or projects in sensitive areas, may need an environmental impact assessment licence from NEMA. Your architect or planner will advise.
7. Other approvals and connections
- water connection from the water company, or borehole permits from the Water Resources Authority
- sewer connection or approval for a septic tank
- electricity connection from Kenya Power
- occupation certificate on completion, required by some counties
How long approvals take
It varies by county, from a few weeks to longer for complex projects. Start early, before buying materials.
Tips
- use registered professionals, as counties require their stamps
- keep copies of approved plans on site
- don’t change the design significantly without re-approval
- follow up regularly with the county
Why approvals matter for value
Approved buildings are easier to sell, insure, rent out and use as security for loans. Unapproved structures can lose value or create legal problems.
Related guides
Looking for a titled plot near Nairobi?
Estbo Properties sells titled 50×100 plots in Nachu, Kikuyu from KSh 800,000, all inclusive, with your title deed transferred within four weeks of final payment. Site visits are free.
See available plots →Book a free site visitFrequently asked questions
Do I need approval to build a house in rural Kenya?
County rules still apply in many rural areas. Check with your county.
How long does building approval take?
It varies by county, from a few weeks to longer.
Can I build first and get approval later?
It’s risky and can lead to penalties or demolition. Get approval first.
Talk to Estbo
Get plot prices and a free site visit
Leave your details and our team will call or WhatsApp you, in your time zone if you’re abroad.
Ready to start your land ownership journey with confidence?
- 📱WhatsApp: Estbo Properties (+254 794 000 022)
- 📞Nairobi Office: +254 794 000 022
- 🌍Diaspora Desk (24 hrs): WhatsApp +254 794 000 022
- ✉️Email: invest@estboproperties.com
- 📍Office: Longet Building, Ground Floor, Room 3, next to Kingdom Bank, Kawangware, Nairobi
- 🌐Website: estboproperties.com
Your land, your title, your future. It starts with one conversation.

Leave a Reply